the new double garage: days 3, 4 and 5

We missed days three and four of the work on the new double garage.  So sue us.  We went on a long scheduled car club trip to exotic New Albany, Indiana (with side trips to even more exotic Louisville Kentucky), and I took a lot of pictures of things other than the process of building a garage and also wrote another hunk of “Spider Time” which I will post starting tomorrow.

new garage-day3-4-blog -And when we got back, we found that the garage is now fully enclosed on the gable ends, sided on three sides with cream colored siding that does not match the house, and has a passenger door with a deadbolt lock.  Not that that counts for much with no overhead door in the big space left for it, but the idea is sound.

new garage-day 5-morning-blogThen, this morning, in the glorious trumpet of sunrise, or at least some world class lens flare, the roofers arrived in a shadowy van.

new garage-day5-roof-blog

By late this afternoon, the new double garage had a proper roof, shingled in Weathered Wood shades of brown and grey.  I hope everyone thinks this is tasteful, because there are not a lot of color choices in Menards “let’s not go overboard on this; it’s just a garage” range of shingles.

 

Advertisements
This entry was posted in art and culture and tagged , . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s